D-Beam® Technology

Steel & Precast.
Reimagined.

One trade. No formwork. No shoring. No above-grade concrete pours. Weather off the critical path - by design.

How the D-Beam® works

The beam sits inside the slab, not below it.

The proprietary D-Beam® girder — an open-web dissymmetric steel beam — is designed to sit within the plane of the precast hollow core slab. This eliminates the beam-below-slab depth that defines conventional steel construction.

Ironworker pumping grout through the D-Beam® web openings into the hollow core slab joint
D-Beam® girder at a steel column, set within the plane of the precast hollow core slabPrecast slabD-Beam®ColumnGrout
Hollow core plank
Depth8 in or 10 in
Width4 ft or 8 ft
Span28, 30 or 34 ft
Before groutingAfter grouting
  • ✓18–24″ of floor-to-floor height saved per level
  • ✓No formwork, no shoring — slabs set directly on D-Beam® bottom flange
  • ✓No above-grade concrete pours — grout placed through web openings
  • ✓Single trade (ironworkers) — eliminates multi-trade sequencing conflicts
  • ✓Upper-floor plank set before lower-floor grouting completes

Assembly sequence

One trade.
Six steps.
No concrete.

The complete assembly sequence performed by a single crew of ironworkers — no specialty trades, no wet concrete above grade, no weather-dependent waiting.

  1. 01

    D-Beam® Erection

    D-Beam® girders erected as part of the standard structural steel package — no separate mobilization required.

  2. 02

    Hollow Core Slab Setting

    Precast hollow core slabs set directly on the D-Beam® bottom flange. No formwork. No shoring. No concrete crew on site.

  3. 03

    Upper-Floor Steel Proceeds

    Upper-floor plank can be installed before lower-floor grouting is complete — breaking the sequential dependency.

  4. 04

    Monolithic Grouting

    Grout placed monolithically through D-Beam® web openings in a single operation. No above-grade concrete pour.

  5. 05

    Composite Slab Complete

    Composite slab complete after grouting. No curing wait required before upper-floor steel erection continues.

  6. 06

    MEP Trades Follow Floor-by-Floor

    Faster access for mechanical, electrical, and plumbing trades — no waiting on a complete structural pour.

Fabrication

One wide flange.
Two D-Beam® girders.
Without waste.

The D-Beam® fabrication process begins with a standard wide flange section, uniquely cut into two equal castellated tees to produce two D-Beam® girders without waste. Fabricated by the project's local steel fabricator via standard competitive bid — no sole-source supplier.

A wide flange steel section with its zig-zag cut line, split into castellated tees that become D-Beam® girders
One wide flange, cut along a zig-zag line into two castellated tees
D-Beam® girder fabrication — flat bar welded to wide-flange steel section
D-Beam® girder fabrication — flat bar welded to wide-flange steel section
D-Beam® girder fabrication — completed assembly with clip angle beam connections
D-Beam® girder fabrication — completed assembly with clip angle beam connections
D-Beam® girder cross-section without flat bar — Girder-Slab® structural assembly
D-Beam® girder cross-section without flat bar — Girder-Slab® structural assembly
D-Beam® girder side view showing flat bar channel where hollow-core plank bears
D-Beam® girder side view showing flat bar channel where hollow-core plank bears
Completed D-Beam® girders at steel fabrication shop ready for delivery
Completed D-Beam® girders at steel fabrication shop ready for delivery
Plasma cutting the web at the fabrication shop

Technical specifications

Design standards & structural performance.

SpecificationDetail
Design ApproachesASD (AISC 9th Edition) and LRFD (AISC 14th Edition)
Building HeightNo height limit — can be built as high as any other structural steel building
Lateral SystemIntegrates with any standard lateral load-resisting system (braced frames, moment frames, concrete shear walls)
FabricationD-Beam® fabricated by the project's local steel fabricator via standard competitive bid — no sole-source supplier
Precast SupplyHollow core slabs from builder's existing precast supplier — no sole-source requirement
TestingVillanova University and Auburn University — load-tested above code-required residential live loads
Fire RatingUL Floor-Ceiling Assembly K912, certified under ANSI/UL 263 (US) and CAN/ULC-S101 (Canada)
Restrained Assembly2-hour and 3-hour ratings available; unrestrained 2-hour
Acoustic (STC)56 bare plank; 59 with 2″ structural topping — both exceed IBC 50 minimum
Markets ServedUnited States, Canada, India
Completed Buildings400+ across residential, hospitality, student housing, senior living, and mixed-use

Acoustic performance

Quiet by structure.
Quieter by finish.

56
STC — 8″ hollow core plank alone
59
STC — with a 2″ structural topping
50
IBC minimum for multifamily residential

The 8″ hollow core plank tests at STC 56 alone and STC 59 with a 2″ structural topping — both exceed the IBC 50 minimum for multifamily residential.

Impact isolation (IIC) is the same story it is for every concrete floor system: bare plank alone doesn't meet code — floor finish does. Carpet with pad reaches IIC 73+. Vinyl tile with sound-deadening underlayment reaches IIC 48–55. Standard residential assemblies clear the IBC 50 minimum comfortably.

All values from tested assemblies on Girder-Slab® precast hollow core plank.STC IIC Code minimum 50
8″ hollow core plank — bare structural baseThe structural assembly alone, before any floor finish
STC
56Above
IIC
28Below
8″ hollow core + 2″ normal-weight toppingStructural topping without floor covering
STC
59Above
IIC
31Below
8″ plank + vinyl tile on 1/8″ foam underlaymentCommon specification for multifamily rental units
STC
50Above
IIC
58Above
8″ plank + vinyl tile on sound-deadening board underlaymentUpgrade spec for condominium and hotel
STC
54Above
IIC
51Above
8″ plank + 1½″ topping + carpet & padPremium residential / hospitality specification
STC
57Above
IIC
76Above
8″ plank + wood flooring on sound-deadening underlayment + suspended acoustical ceilingHigh-end hotel / senior living specification
STC
59Above
IIC
61Above

Values from tested assemblies. A complete data set including 6″ and 10″ plank, gypsum concrete, wool carpet, and assemblies with suspended ceilings is available in the Acoustic Performance Data Sheet on the For Engineers page.

STC

Sound transmission

Measures airborne sound isolation (voices, TV, music). Code-minimum STC 50 means a loud conversation in the unit above is audible but not intelligible. The Girder-Slab® assembly alone exceeds this baseline; floor coverings typically raise it further.

IIC

Impact isolation

Measures impact sound (footsteps, dropped objects). Code-minimum IIC 50 is driven almost entirely by floor finish — this is true for every concrete floor system, not just Girder-Slab®. Standard residential finishes (carpet, vinyl with underlayment) clear the minimum comfortably.

Get the full design guide.

Design Guide v4.0, D-Beam® Calculator, CAD details, and specification language — all free.