Build withspeed Build withcertainty Build withconfidence Build withprecision Build with

Plasma torch cutting steel with a spray of sparks

D-Beam®

Steel + precast, engineered into one floor.

No formwork. No shoring. No above-grade concrete pours.

Cutaway of the Girder-Slab system: precast plank slabs bearing on the D-Beam girder's bottom flange, with grout flowing through the web into a reinforced cell
  1. The D-Beam® girderPrecast slabs sit on its bottom flange, concealing the top flange and web. No formwork or shoring needed.
  2. Prefabricated off siteUnlike cast-in-place concrete, the system uses prefabricated materials that are quickly erected on site.
  3. Grout flows throughOnce slabs are set, grout flows around the D-Beam, through its web openings and 12″ into a reinforced cell.
  4. Just a few tradesmenThe cement grout is liquefied and pumped through a hose — a simple process for a small crew.
  5. Builds in any climatePrecast slabs can be set in nearly any climate condition, including freezing temperatures.
  6. Faster access for tradesOther trades start sooner. Coring slabs for utilities is easier and permits final adjustment.
  7. Ready once groutedThe composite slab is complete and ready for use. Floor leveling follows once the building is enclosed.
  8. Ceiling-ready undersideThe underside of the slab is ready-made for ceiling finish.

Floors gained

Two more floors. Same height.

18″–24″ saved on every level adds leasable floors at permitted height.

Same-height tower framed with Girder-Slab, fitting more floorsGirder-Slab floor detail: D-Beam with grout and precast concrete planks, 8 inches total, bearing on the wall
2 floors gained
Tower framed with conventional structural steelConventional floor detail: 6-inch concrete slab on an 18-inch I-beam with ceiling below, 24 inches total
Conventional steel Girder-Slab®

The industry problem

Construction is broken.Your project pays the price.

The construction industry has declined by every objective measure since 1970. For developers and project teams, this is a direct threat to project viability.

The Girder-Slab® advantage

Faster, safer and under budget.

01

Speed

  • Construction becomes assembly
  • No shoring
  • High-quality prefabricated parts
02

Slim floors

  • Eliminates wasted space
  • Adds floors vs. conventional steel
03

Less labor

  • Fewer workers on site
  • Safer work platform
  • Single-trade dependency
04

Year-round

  • Build in all conditions
  • No heating or hoarding
  • 3–4 floors before grouting
05

Cost

  • Faster completion
  • Lighter structure, less material
  • 17–18% verified savings

Open procurement. No sole-source suppliers.

Steel and plank bid by your customary subs.

Proven performance

Numbers from completed buildings, not projections.

The Girder-Slab® performance record spans hundreds of completed projects across three countries.

400+Completed buildings
73%Repeat use rate
4Months faster — revenue starts sooner, carrying costs stop sooner
41.7%Less embodied CO₂ — Edmonton International Airport Hotel vs. its original cast-in-place design
Hamilton Phase II

Selected projects

  • Multifamily · New Jersey

    Hamilton Phase II

    Documented 4-month schedule reduction. Financing cost reduced, revenue start date advanced.

    4 mo.Saved
  • Hospitality · Edmonton, AB

    Edmonton International Airport Hotel

    Embodied CO₂ cut 41.7% vs. the original cast-in-place design, with a documented schedule reduction.

    41.7%Less CO₂
  • Multifamily · Boston, MA

    Troy Boston

    378 units, $185M campus. Two additional floors enabled — physically impossible with conventional steel.

    +2Floors added
  • Student housing · Boston, MA

    Simmons University Living & Learning Center

    18-story mixed-use residence and campus center. 1,100 beds, $311M project. LEED Certified.

    1,100Beds
  • Hospitality · Bristol, VA

    Hard Rock Hotel & Casino Bristol

    303-key hotel anchoring $515M casino resort | 6 stories | 141,896 SF | TN Ward | Steelfab

    303 keysHotel rooms

Built for every seat at the table.

Developer

Finish on time, on budget. Every time.

Developer

“I need projects to finish on time, on budget, every time.”

Girder-Slab® isn’t a premium option — in high-cost urban markets it’s risk management. The conventional alternative carries compounding tail risk that can erase the profit of several successful projects.

  • 18% verified all-in savings vs. conventional steel + concrete
  • 4-month schedule reduction advances revenue, cuts carry costs
  • Floor-count optimization at permitted height = permanent revenue
  • Weather eliminated from the critical path

Structural Engineer

Standard details. Free tools. A team behind you.

Structural Engineer

“Give me something that works with how we design buildings.”

ASD and LRFD compatible. No proprietary analysis software. CS3 provides free engineering consultation throughout design — tools, details, and spec language at no cost to the project.

  • ASD (AISC 9th) and LRFD (AISC 14th) fully supported
  • D-Beam® Girder Calculator — free, live sizing tool
  • Standard CAD details + specification language provided
  • UL K912 fire rating — 2-hour and 3-hour restrained assemblies

General Contractor

One trade. No sequencing conflicts.

General Contractor

“I need a structure my crews can actually build on schedule.”

One trade. No wet concrete above grade. No shoring stack gating your schedule. Steel erection proceeds above planked floors — breaking the sequential dependency that makes conventional pours so punishing.

  • Single trade erection — ironworkers only, no sequencing conflicts
  • No shoring — no 3-floor shoring stack blocking progress below
  • No 28-day cure wait — upper floors proceed immediately
  • MEP follows floor-by-floor — faster access, fewer conflicts

Architect

Thinner floors. More design freedom.

Architect

“Show me what the floor-to-floor numbers actually mean for my design.”

18–24″ of additional floor-to-floor height per level is design real estate. More ceiling height at the same footprint, more floors at the same permitted envelope, or both. CS3 works directly with the design team.

  • 2+ additional floors at permitted height — Troy Boston case study
  • Greater ceiling heights at same envelope = premium unit positioning
  • STC 55+ without carpet — IIC meets code with standard finishes
  • All demising walls non-load bearing — full flexibility

Start with a free evaluation.

CS3 reviews your project’s fit for Girder-Slab® — at no cost to the project.